1. Fast application by pump, enables large areas of floor to be completed in a working day
2. Rapid hardening and curing allows speedy access for foot traffic and overlaying with carpet, vinyl etc.
3. One pack product, applied by pump eliminates on-site batching and ensures consistency of mixed product
4. Dimensionally stable, can be installed in large areas
5. Excellent adhesion to prepared substrates
6. Environmental friendly
Table 1 Specification of Polar Bear Self-levelling Materials
Standard Grade |
F10 C30 |
F10 C30 |
F10 C30 |
F6 C25 |
F4 C20 |
|
Name |
CSA-Ⅰcolor |
CSA-Ⅰ |
CSA-Ⅱ |
CSA-Ⅲ |
CSA-Ⅳ |
|
Setting Time |
I.S., min |
100-120 |
100-120 |
100-120 |
60-90 |
90-100 |
F.S., min |
120-150 |
120-150 |
120-150 |
100-120 |
100-120 |
|
Compressive Strength (MPa), ≥ |
1d |
6.0 |
6.0 |
6.0 |
8 |
8 |
7d |
20 |
20 |
20 |
15 |
15 |
|
28d |
30 |
35 |
30 |
25 |
20 |
|
Drying Shrinkage, % |
< 0.10 |
< 0.05 |
< 0.05 |
< 0.05 |
< 0.05 |
|
Bonding Strength(MPa) |
> 1.0 |
> 1.0 |
> 1.0 |
> 1.0 |
> 1.0 |
|
Flow |
Initial |
≥130mm |
≥140 mm |
≥145 mm |
||
After 20min |
≥130 mm |
≥130 mm |
≥130 mm |
|||
Working Life |
≥20 min |
|||||
Application Temperature |
5-30℃ |
|||||
Walk-on time |
8h |
3-4h |
||||
Time to overlaying |
1-3d |
1-2d |
1-2d |
1d |
1d |
|
W/P ratio |
0.18 |
0.18 |
0.20 |
0.25 |
0.24 |
1. As underlayment for epoxy, PU etc.
2. As leveling material for PVC, tiles, carpets and wooden floor.
3. As wearing overlayment.
4. As decorative flooring material
Preparation
1. The substrate should be clean, sound and free from loose material and contamination such as
plaster, oil, paint and grease. The substrate should have a compressive strength of at least 20
MPa and a surface tensile strength of at least 1MPa (pull-off strength).
2. Excess laitance should be removed by mechanical methods followed by vacuuming and water
cleaning to remove dust debris.
3. Oil and grease can be removed by chemical detergent followed by water cleaning.
4. New concrete should be at least 14 days old.
5. In case of porous substrate or hot weather, the substrate should be ponded with clean water
for 1~3 hours before priming.
Priming
The object of priming is to seal the substrate to prevent air release from the subfloor rising and
forming bubbles and pinholes on the surface. Extremely porous substrates may require two
priming/sealing coats. Primer coats must be allowed to dry before applying the self-levelling
material.
Pumping or Mixing by hand
1. This is a specialized activity and the product must be applied by a recommended contractor
who has been fully trained in the use of the product and equipment.
2. In case of installation by hand, pour the mixing water into the clean mixing vessel. Add the
whole bag of powder slowly to the water, mixing continuously with a heavy duty drill fitted
with a suitable paddle. Mixing should continue for at least 3 - 5 minutes
3. Whatever pumping or mixing by hand, make sure that a smooth creamy consistency is
obtained.
4. Do not mix more material than can be reasonably laid within the flow time of the material.
However, ensure that subsequent mixes are ready to enable continuous pouring.
Pouring
1. Make sure there is no ponding of primer before pouring the material。
2. pump should be used for large area application.
3. Pour the mixed material on to the dry primed surface, spread with trowel and allow to
self-smooth. Roll surface with the purpose made spiked roller. Best results are achieved
when the pouring and leveling is a continuous process.
Cleaning
1. The material should be removed from tools and equipment with clean water immediately
after use. Hardened material can only be removed mechanically.
Curing
Curing is not essential normally. But in case of high environmental temperature, direct sunlight
or windy weather plastic sheet should be used to cover the hardened surface for 2 days.
Estimation
Package |
|
Self-levelling material |
25 kg/bag |
Primer |
50 kg/bucket |
consumption |
|
Self-levelling material |
1.7~1.8 kg/m2 · mm |
Primer |
5 m2/L/2 coats |
Coating
In areas that are subjected to regular water immersion or chemical attack from acids or
organic solvent, it is recommended to protect the self-levelling material with an epoxy
floor coating. For more information please refer to the technical support of Polar Bear.
Limitation
Concrete substrate onto which the self-levelling material is to be applied must have a
surface temperature of at least5℃, with the air temperature of at least 10℃.
Avoid direct sunlight onto the applied floor or wind blowing over the floor surface during
application and the initial stage of curing.
When used as an overlayment,an appropriate sealer should be used to enhance the
wearing resistance as well as the colour shade.
◇ Beijing Benz-Daimler Chrysler Automotive Ltd. (BBDC) ◇ Beijing 301 Hospital
◇ Beijing Siemens Group ◇ Beijing Zhongguancun Putian Plaza
◇ Changde cigarettes factory ◇ Tangshan Ronghe Jingyuan
◇ CCTV data center ◇ Beijing Tongzhou district Luhe hospital
◇ Beijing Baiziwan New city building sale house ◇ Changchun Eurasian Mall
◇ Tangshan Chuangyuan Fangda instruments Co.,Ltd warehouse ◇ Beijing Chuangjia Printing Company
◇ Beijing Yifei electric warehouse, worker’s canteen ◇ Beijing Baodaming decorate company office department
◇ Beijing Zhuoda University Hall